From block diagram to production
Six steps, the same for every project. You see what happens next at each one, and nothing moves to production before your team has inspected a first article.
Send a requirement
A block diagram or a specification. Which board, which interfaces, which environment, how many a year. No full drawings yet.
Get a feasibility review
The engineers come back with questions, risks and a design-for-manufacture view. No cost, no commitment.
Screening and NDA
We screen the parties involved, sign a three-way NDA and confirm whether your data is export-controlled.
Drawings and quote
Full drawings go from you straight into the engineering team's secure environment. You get a quote against your specification.
Design review and first article
A design review, then a first-article build that your team inspects before anything goes into production.
Production
Builds run on agreed milestones, with payment staged against the same milestones. Boards ship from Taiwan directly to you.
Working on a European programme? Because we build to your design and you keep design authority, the boards can count within the non-EU share that programmes such as SAFE and EDIP allow. Your programme's rules decide, so raise it early and we will work through it with you.
Export control, handled before anything else
TDM Technologies B.V. is a Dutch company and works under Dutch and EU export-control law. The checks below happen before a quote, not after an order.
- Screening before every quoteEvery buyer, end user and forwarder is checked against EU, UK, US and UN sanctions lists before we quote, and the result is kept on file.
- Controlled items wait for authorisationItems that need an export licence or a notification are quoted only once that licence or notification is in place.
- Your drawings stay out of emailStart with a block diagram or a specification. Full drawings follow under a three-way NDA and go directly to the engineering team, after you confirm whether the data is export-controlled.
- Clear limitsWe do not work with parties linked to Russia, Belarus, Iran or North Korea.
Which board do you want a second source for?
Send a block diagram or a specification. You get a feasibility and design-for-manufacture review back. No cost, no commitment.

